|
quality control
New boat problems that could have been avoided with proper QC inspection:
1. Incorrect circuit breakers installed for bilge and baitwell pumps
2. No lock washers on the thru bolts securing the grab rail to the console
3. Hull deformities that were eventually repaired by the factory
4. Stern seat back frames with improper welding - replaced by the factory
|