View Single Post
  #49 (permalink)  
Old 02-26-2008, 07:22 AM
OspreyVic's Avatar
OspreyVic OspreyVic is offline
Moderator
Captains Club Member
210 CC Owner
 
Join Date: Nov 2004
Location: FL
Posts: 678
Thanks: 95
Thanked 100 Times in 78 Posts
Well the initial install is finally finished.

We ended up with four coats of rule around the outside of the covers. Every time we put down a bead, it would shrink down as it cured, leaving a low spot for water to sit. We ran out of rule with all of our winter projects, so I guess we are finished.

We also covered each screw head with rule so they will not rust.

We might clean up the appearance by going over everything with mineral spirits, after a few more weeks of curing.

Below are the pictures of how they look today.
Attached Images
File Type: jpg Starboard Splashwell 2-25-2008.jpg (33.6 KB, 38 views)
File Type: jpg Port Splashwell 2-25-2008.jpg (41.6 KB, 29 views)
__________________
Vic in Osprey FL
2005 Triumph 210 CC with a collapsible radar arch on a Rolls Axle trailer
Boat Name: Irresistible
Reply With Quote
The Following User Says Thank You to OspreyVic For This Useful Post: